最新抵押贷款:2016 年由 ASTORIA BANK 提供,金额 US$2,825,077(另有 3 条,详见财务选项卡)· ACRIS
建筑详情
✓ 已验证 · PLUTO
建筑面积
41,420 sf
分区
R7A
地下室
半地下室
土地用途
多户电梯公寓
登记业主
510 W 144TH Associates
租金管制
Yes · 31 regulated units(DHCR)
快速信息
这栋楼有多少户?
43 户住宅.
这栋楼有多高?
6 层, non-fireproof结构, 建于 1925 年.
地块有多大?
9,992 平方英尺 (100 × 99.92 ft).
建筑类别是什么?
D1 类 — Elevator apt。
这块地上有几栋楼?
地块上 1 栋建筑.
总体前景
Long-term signal for residential or commercial viability
Stable — Review Maintenance
维护可靠性
Multiple open violations — proceed with caution
82 / 100
安全
Moderate activity — typical urban
72 / 100
日常生活
Transit access via 145 St (1)
~3分钟 subway
Compliance · 10-year history
Violation timeline
DOB · HPD · OATH
201620182020202220242026
Active4Resolved with debt0Resolved46Hover any dot for detail
Violations & maintenance history
HPD · DOB · OATH — 4 open, 46 resolved
Open Issues — 4
Minor
§ 27-2017.3 HMC: trace and repair the source and abate the visible mold condition... (approx. 1 sq. Ft.) at celing in the bathroom located at APT 42, 4th story, 1st apartment from north at east original violation 15352811 issued 02-sep-22 has been upgraded to class b per administrative code §27-2017.3A(3)(a) or (b).
HPD · Filed 2022年9月 · Open
Critical
§ 27-2056.7, 27-2056.8, 27-2056.9 ADM code -certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six
Apt 42 · 4th floor · 1st apartment from north at east
HPD · Filed 2022年9月 · Open ·
Critical
§ 27-2056.6 ADM code - correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) west wall
Apt 42 · 4th floor · 1st apartment from south at west
HPD · Filed 2021年6月 · Open ·
Critical
§ 27-2056.6 ADM code - correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall, west wall
Apt 42 · 4th floor · 3rd room from north · 1st apartment from south at west
HPD · Filed 2021年6月 · Open ·
Resolved History — 46 (showing 3)
Closed
Repair the leaky and/or defective faucets ... At the sink
§ 27-2026 ADM CODEApt 54 · 5th floor
HPD · Filed 2026年2月 · Closed ·
Closed
Paint with light colored paint ceiling in building entranceway
§ 27-2013 ADM CODE
HPD · Filed 2025年2月 · Closed ·
Closed
Properly repair with similar material the broken or defective fire retardant material at ceiling in building entranceway