61 Lexington Condominium 61 Gramercy Park Associates
租金管制
Yes · 1 regulated units(DHCR)
快速信息
这栋楼有多少户?
40 户住宅 及 15 个商业空间.
这栋楼有多高?
7 层, 建于 1930 年.
地块有多大?
4,723 平方英尺 (59.17 × 79.83 ft).
建筑类别是什么?
RM 类 — Condo。
这块地上有几栋楼?
地块上 1 栋建筑.
总体前景
Long-term signal for residential or commercial viability
Stable — Review Maintenance
维护可靠性
Multiple open violations — proceed with caution
78 / 100
安全
Moderate activity — typical urban
74 / 100
日常生活
Transit access via 28 St (6)
~3分钟 subway
Compliance · 10-year history
Violation timeline
DOB · HPD · OATH
201620182020202220242026
Violations & maintenance history
HPD · DOB · OATH — 5 open, 10 resolved
Open Issues — 5
Minor
Atoi observed installation of 16 new led lights at the ground floor commercial property called "bao bao cafe". As per DOB database no permit on file., obtain permit
OATH · Filed 2025年9月 · Open
Minor
§ 329, M/D law and DEPT. Rules and regs. Provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
HPD · Filed 2019年11月 · Open
Minor
In. Code: post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agency s housing information guide. A sample notice can be found at www. NYC. Gov/hpd. At public hall, 1st story
§ 26-1103 ADM
HPD · Filed 2019年11月 · Open ·
Minor
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system at 1st story public hall and outside door of boiler room
§ 27-2033 ADM CODE
HPD · Filed 2019年11月 · Open ·
Minor
Provide ready access to buildings heating system at basement at boiler room
§ 27-2033 ADM CODE
HPD · Filed 2019年10月 · Open ·
Resolved History — 10 (showing 3)
Closed
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story
§ 27-2033 ADM CODE
HPD · Filed 2026年2月 · Closed ·
Closed
Provide ready access to buildings heating system door locked at cellar at boiler room
§ 27-2033 ADM CODE
HPD · Filed 2026年2月 · Closed ·
Closed
Provide an adequate supply of heat for the apartment
§ 27-2029 ADM CODEApt 6S · 7th floor · 1st apartment from east at south
HPD · Filed 2026年2月 · Closed ·
Active5Resolved with debt0Resolved8Hover any dot for detail