Long-term signal for residential or commercial viability
Elevated Risk
维护可靠性
Multiple open violations — proceed with caution
25 / 100
安全
Elevated activity — consider before signing
36 / 100
日常生活
Transit access via Tompkinsville (SIR)
~4分钟 subway
Compliance · 10-year history
Violation timeline
DOB · HPD · OATH
201620182020202220242026
Violations & maintenance history
HPD · DOB · OATH — 35 open, 16 resolved
Open Issues — 35
Minor
Paint with light colored paint the ceiling at vestibule area , 1st story
§ 27-2013 ADM CODE
HPD · Filed 2026年4月 · Open ·
Minor
Properly repair with similar material the broken or defective fire retardant material at ceiling at vestibule area , 1st story
§ 27-2005 ADM CODE
HPD · Filed 2026年4月 · Open ·
Minor
§ 27-2026, 2027 HMC: properly repair the source and abate the evidence of a water leak at the ceiling at vestibule area , 1st story
HPD · Filed 2026年4月 · Open
Minor
§ 27-2017.3 HMC: trace and repair the source and abate the visible mold condition... Less than 10SQ ft at ceiling and east wall in the 1st room from north located at b-room 35, 3rd story, 3rd b-room from west at north original violation 18312016 issued 20-oct-25 has been upgraded to class b per administrative code 27-2017.3A(3)(a) or (b).
HPD · Filed 2025年10月 · Open
Minor
§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( c) mdl and 28 rcny §25-171: replace or repair the self-closing doors that is missing or defective jams the door in the door frame in the 1st entrance from north located at b-room 35, 3rd story, 3rd b-room from west at north
HPD · Filed 2025年10月 · Open
Resolved History — 16 (showing 3)
Closed
§ 27-2017.3 HMC: trace and repair the source and abate the visible mold condition... Less than 10SQ ft at ceiling and east wall in the 1st room from north located at b-room 35, 3rd story, 3rd b-room from west at north
HPD · Filed 2025年10月 · Closed
Closed
§ 27-2017.3 HMC: trace and repair the source and abate the visible mold condition... Greater than 30 sq ft at ceiling at vestibule area , 1st story
HPD · Filed 2025年9月 · Closed
Closed
§ 27-2026, 2027 HMC: properly repair the source and abate the evidence of a water leak at ceiling at vestibule area , 1st story
HPD · Filed 2025年9月 · Closed
Active35Resolved with debt0Resolved16Hover any dot for detail